Cont

Have any Questions?

 

Heat Pump Production Line

1. The chassis is online

 
DSC00225

 

DSC00213

 

 liquid reservoir

 

 

2. Install the compressor

 
Grounding wire

 

binding compressor

 

 

3. Install the evaporator and condenser.

heat-pump-evaporator

 

Install-the-evaporator-assembly

 

Install-condenser

 

 

4. Pipeline connection

 
Pull out the pipe plug

 

pipe connection

 

pipe welding

 

 

5. Leak detection: fill with nitrogen and detect leaks.

 
fill-with-nitrogen

 

detect-leaks

 

 

6. Pack insulation pipe and compressor silencer cotton.

 
Pack-insulation-pipe

 

DSC02159

 

 

7. Install the motor, fan blades, brackets, and reactors.

Install-the-motor
Install-fan-blades
Install-the-reactors

 

8. Intubation warm wire, Wiring,  management, and Install fuselage parts.

 
Intubation-warm-wire
Install-electric-control-components
Line-management
Install fuselage parts

 

9. Vacuumizing and charging refrigerant

 

DSC01424

 

Charge-refrigerant

 

10. Safety inspection and Performance testing.

 

 

security check

 

security check

 

Halogen-leak-detection

 

Performance-testing

 

 

11. Paste the panel label and Accessories.

Paste the panel label

Paste the panel label

Bag accessories, bag rubber blocks

Bag accessories, bag rubber blocks

 

12. Packing

 
①Put on the packaging bag and wrap the sponge on the top and corners of the machine.

①Pack wooden boxes and put them into storage.

POWERWORLD
Fixed packing in wooden box