Heat Pump Production Line
1. The chassis is online



2. Install the compressor


3. Install the evaporator and condenser.



4. Pipeline connection



5. Leak detection: fill with nitrogen and detect leaks.


6. Pack insulation pipe and compressor silencer cotton.


7. Install the motor, fan blades, brackets, and reactors.



8. Intubation warm wire, Wiring, management, and Install fuselage parts.




9. Vacuumizing and charging refrigerant


10. Safety inspection and Performance testing.




11. Paste the panel label and Accessories.

Paste the panel label

Bag accessories, bag rubber blocks
12. Packing
①Put on the packaging bag and wrap the sponge on the top and corners of the machine.
①Pack wooden boxes and put them into storage.